Manchester International Airport - Shotcrete works

Kier Transportation - CP7 NWC

Closed

Key facts

Closing date
Friday 16 October 2026, 17:00 (UK time)
Buyer's estimated value
£500,000 (excl. VAT) The buyer's own estimate, not income to you.
Contract period
10 Feb 2027 to 27 Jul 2027
Procedure
Not stated
Notice type
Not stated

Decision brief

Taken from the buyer's published notice (shown as written, shortened where long). Tenderpatch has not added to or interpreted it. Always read the official documents before bidding.

How bids will be scored
Not stated in the notice.
Conditions of participation (what you must show)
None published in the notice. They may be in the tender documents.
Contract length and extensions
10 Feb 2027 to 27 Jul 2027.
How to submit
Not stated in the notice.
Tender documents
No document links in the notice. Use the official notice link.
New to public tenders? Plain-English guide to this page
Framework
An agreement that sets terms for work the buyer may order later, often from several suppliers. The value shown usually covers the whole agreement, not one job.
Open for bids / closing date
You must submit by the closing date and time, normally through the buyer's own online portal. Late bids are normally refused.
Clarification questions
A deadline for asking the buyer questions about the tender. It is earlier than the closing date.
Conditions of participation
What the buyer asks suppliers to show before they can be considered, such as experience, insurance or accreditations.
Bids are scored on
How the buyer will compare bids, usually a split between price and quality. A 60/40 split in favour of quality means the cheapest bid will not necessarily win.
Lots
A tender can be split into parts. You can often bid for only the lots that suit you.
Area (ITL)
The buyer names an official statistical area for where the work is, not a street address. Check the tender documents for the actual sites.
UK4 and other notice codes
Official codes for the type of notice. A "tender notice" means bids are being invited.

General explanations written by Tenderpatch, not part of this notice.

Description

The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable.Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: -Preparation and cleaning of exposed contiguous piled retaining wall faces. -Supply and installation of mesh reinforcement, anchor bars and injection mortar. -Supply, delivery, application, curing and finishing of sprayed concrete (shotcrete). -Formation and sealing of expansion and construction joints. -Protection of adjacent assets from rebound, overspray and damage. -Testing, inspection, quality assurance and handover documentation. -Removal and disposal of rebound material, washout and associated waste. -Working within a live rail and airport environment in accordance with all project and Network Rail requirements.

Changes detected

  • 16 Oct 2026: Status changed from open to closed