Skip to content
Tenderpatch

Heating, Electrical, Mechanical and Decarbonisation Framework

EASTERN PROCUREMENT LIMITED

Open Closes in 19 days

Key facts

Closing date
Wednesday 4 November 2026, 12:00 (UK time) Closes in 19 days
Buyer's estimated value
£1,060,972,300 (excl. VAT) The buyer's own estimate, not income to you. For a framework this usually covers the whole agreement, not a single contract.
Clarification questions deadline
26 October 2026, 12:00
Contract period
6 Jan 2027 to 5 Jan 2031
Procedure
Open procedure
Notice type
Tender notice (UK4)
Suitable for SMEs (per buyer)
Yes
Arrangement
Framework agreement

Decision brief

Taken from the buyer's published notice (shown as written, shortened where long). Tenderpatch has not added to or interpreted it. Always read the official documents before bidding.

How bids will be scored
  • Price
  • Quality
Conditions of participation (what you must show)
None published in the notice. They may be in the tender documents.
Contract length and extensions
6 Jan 2027 to 5 Jan 2031.
How to submit
Through in-tendhost.co.uk ↗ (the buyer's own portal). Electronic submission: allowed.
Changes the buyer has announced
  • Tender return date extended
Tender documents

Document ↗ (in-tendhost.co.uk)

New to public tenders? Plain-English guide to this page
Framework
An agreement that sets terms for work the buyer may order later, often from several suppliers. The value shown usually covers the whole agreement, not one job.
Open for bids / closing date
You must submit by the closing date and time, normally through the buyer's own online portal. Late bids are normally refused.
Clarification questions
A deadline for asking the buyer questions about the tender. It is earlier than the closing date.
Conditions of participation
What the buyer asks suppliers to show before they can be considered, such as experience, insurance or accreditations.
Bids are scored on
How the buyer will compare bids, usually a split between price and quality. A 60/40 split in favour of quality means the cheapest bid will not necessarily win.
Lots
A tender can be split into parts. You can often bid for only the lots that suit you.
Area (ITL)
The buyer names an official statistical area for where the work is, not a street address. Check the tender documents for the actual sites.
UK4 and other notice codes
Official codes for the type of notice. A "tender notice" means bids are being invited.

General explanations written by Tenderpatch, not part of this notice.

Description

The procurement will establish a single combined, multi-supplier Heating, Electrical, Mechanical and Decarbonisation Framework, not divided into lots, for the provision of works and associated services to domestic and non-domestic properties and buildings, including occupied and void properties. The scope will include, but is not limited to, the provision, supply, installation, replacement, upgrading, servicing, statutory and safety inspection, testing, planned and responsive maintenance and repair of heating, electrical, mechanical, renewable, low-carbon and associated energy systems. Heating works and services will include domestic and commercial/communal systems and equipment using gas, oil, solid fuel, electricity and renewable or low-carbon technologies, including gas and oil boilers, electric storage and panel heaters, electric low-pressure hot water boilers, air source heat pumps, solar-assisted heat pumps, ground source heat pumps, biomass boilers, combined heat and power and micro-CHP systems, heat networks, solar thermal systems, microgeneration installations, wind turbines and other emerging renewable heating and energy technologies. Associated heating and hot-water systems may include hot and cold water services, vented and unvented hot-water cylinders, oil storage tanks, flues, pumps, filling loops, pipework, radiators, low-surface-temperature radiators, fan convectors, controls, smart thermostats and associated electrical controls, together with pipework system cleaning, flushing, de-sludging, de-scaling, sterilisation, water treatment and pipe insulation. The framework will include annual heating safety checks and servicing, Landlord safety and compliance requirements, servicing and maintenance of thermostatic mixing valves and unvented cylinders, planned and responsive repairs, breakdown services, replacement of defective components and systems, void and mutual-exchange checks and emergency and out-of-hours attendance, including 24-hour, 365/366-day services where required. Electrical works and services will include complete and partial rewiring, upgrading, alteration, inspection, testing, certification, Electrical Installation Condition Reports and associated remedial works; consumer units and distribution equipment; RCBOs, RCDs/RCCBs, AFDDs and surge protection devices; main service intake works and associated DNO requirements; earthing and bonding; power, lighting and final circuits; sockets, switches and appliance supplies; immersion heaters; electric showers; connections to heating and boiler systems; external and communal/landlord lighting; supplies to outbuildings and external stores; extract fans and ventilation-related electrical works; doorbells; TV aerial cabling and outlets; photocells, time switches and lighting controls; and associated electrical equipment and systems. The electrical scope will also include domestic fire detection and smoke, heat and carbon-monoxide alarm systems and associated equipment, including interconnection and radio-frequency equipment, together with servicing, maintenance and responsive repair of electric heating installations and 24-hour breakdown provision. Electric vehicle charging infrastructure may be supplied and installed, including associated equipment and services required to provide fully operational charging installations. Mechanical works and services will include mechanical ventilation with heat recovery systems and associated equipment, thermostatic mixing valves, boosted cold-water pump installations and other mechanical equipment associated with heating, hot water, ventilation and energy systems, including servicing and maintenance where required. The decarbonisation and energy scope will include solar photovoltaic systems and associated services, including inverters, controls, metering, monitoring and battery storage systems, together with solar thermal, air source heat pumps, ground source heat pumps, solar-assisted heat pumps, biomass, CHP/micro-CHP, heat networks, wind turbines, mechanical ventilation with heat recovery, smart heating controls, sensors and monitoring equipment and other emerging renewable, low-carbon and energy-efficiency technologies associated with the heating, electrical, mechanical and decarbonisation scope that may be required during the life of the framework. The framework may support retrofit, decarbonisation, ventilation, overheating, indoor-air-quality, EPC improvement, net-zero and future energy-performance requirements, including requirements arising from grant-funded programmes. Retrofit assessment, energy and technical support services may include pre- and post-works Energy Performance Certificates, energy assessments, SAP10 assessments, retrofit assessments, retrofit coordination, retrofit design, PAS 2035 site visits, air-pressure testing, technical monitoring and cavity-wall borescope services, together with associated services. Legionella risk assessments may also be instructed where required in connection with the works and systems covered by the framework. Project management services may be provided for heating, electrical, mechanical, retrofit and decarbonisation programmes, including grant-funded programmes, and may include management and coordination of the appointed supplier's own works and/or coordination of works delivered in collaboration with other framework suppliers. Requirements may be delivered as individual property works, grouped schemes, planned programmes, servicing and compliance programmes, responsive repairs, emergency works, grant-funded projects and larger retrofit or decarbonisation programmes, together with associated services. The framework is intended to remain sufficiently flexible to respond to changes in legislation, technical standards, funding requirements and technology during its term, including the introduction of emerging renewable and energy-efficiency measures falling within the heating, electrical, mechanical and decarbonisation scope. Suppliers appointed to the framework, either directly or through their declared supply chain, will be required to have the capability to deliver the overall range of works and services included within the scope. Works will be delivered utilising the JCT MTC contract and orders being placed by Clients utilising the contract mechanisms Below are the details of all documents included in the tender pack: Volume 1 Introduction to the Tender Volume 2 Operation of the Tender Volume 3 Specification Volume 4 Contract Introduction Volume 4.1 Standard Form FAC-1 Volume 4.2 FAC-1 Amendments Volume 4.3 JCT MTC 2024 Volume 4.4 JCT MTC 2024 Amendments Volume 5 Pricing Introduction Volume 5.1 Pricing Framework Volume 6 Quality Evaluation Volume 7 Conditions of Participation Volume 8 Key Performance Indicators Appendix A Certificate of Bona Fide Tender & Non-Canvasing Certificate Appendix B Key Staff Appendix C Documents to Return Checklist Appendix D AI Disclosure The Conditions of participation are applicable to the procurement and are set out in full in the procurement documents attached to this Tender Notice.