Skip to content
Tenderpatch

ITT - Swindon Archive Decarbonisation Design Team (UID 320)

Historic England

Open Interest closes in 19 days

Key facts

Deadline to express interest or request to participate
Wednesday 4 November 2026, 09:30 (UK time) Interest closes in 19 days
Buyer's estimated value
£149,000 (excl. VAT) The buyer's own estimate, not income to you.
Clarification questions deadline
28 October 2026, 17:00
Contract period
28 Jan 2027 to 30 Sep 2027
Procedure
Competitive flexible procedure
Notice type
Tender notice (UK4)

Decision brief

Taken from the buyer's published notice (shown as written, shortened where long). Tenderpatch has not added to or interpreted it. Always read the official documents before bidding.

How bids will be scored
  • Pricing 30% : RIBA Stage 3 fixed price schedule RIBA Stage 3 Rate table RIBA Stage 4 Rate table
  • Quality 70% : Quality 1 - Understanding of Project Objectives and Option Review Approach Quality 2 - Methodology for Option Validation, Design Development and Technical Delivery Quality 3 - Understanding of Archive Collection Require…
Conditions of participation (what you must show)
None published in the notice. They may be in the tender documents.
Contract length and extensions
28 Jan 2027 to 30 Sep 2027. Extensions: RIBA stage 4 - we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3).
How to submit
Please find further details of the project and submit any questions / submit your response to the procurement specific questionnaire (conditions of participation) via our free procurement portal : https://supplier.in-tend.co.uk/historicengland/home Please be aware at this Stage 1 (procurement speci… Open supplier.in-tend.co.uk ↗ Electronic submission: allowed.
Tender documents
No document links in the notice. Use the official notice link.
New to public tenders? Plain-English guide to this page
Framework
An agreement that sets terms for work the buyer may order later, often from several suppliers. The value shown usually covers the whole agreement, not one job.
Open for bids / closing date
You must submit by the closing date and time, normally through the buyer's own online portal. Late bids are normally refused.
Clarification questions
A deadline for asking the buyer questions about the tender. It is earlier than the closing date.
Conditions of participation
What the buyer asks suppliers to show before they can be considered, such as experience, insurance or accreditations.
Bids are scored on
How the buyer will compare bids, usually a split between price and quality. A 60/40 split in favour of quality means the cheapest bid will not necessarily win.
Lots
A tender can be split into parts. You can often bid for only the lots that suit you.
Area (ITL)
The buyer names an official statistical area for where the work is, not a street address. Check the tender documents for the actual sites.
UK4 and other notice codes
Official codes for the type of notice. A "tender notice" means bids are being invited.

General explanations written by Tenderpatch, not part of this notice.

Description

Historic England is seeking to appoint a multidisciplinary design team to develop the Archive Decarbonisation Project at its national archive facility in Swindon through RIBA Stage 3. Under the terms of this contract, we reserve the right to award RIBA stage 4 following the satisfactory completion of stage 3 and the receipt of an acceptable return for Stage 4 methodology and pricing schedule (in line with rates provided at stage 3). The Historic England Archive is one of the nation's most significant collections of records relating to England's historic environment. The purpose-built archive store was constructed in 1993 to BS5454 standards and provides specialist environmental conditions for the long-term preservation of nationally important photographic, film and documentary collections. However, the building and its associated mechanical and electrical systems were not designed with energy efficiency or net-zero objectives in mind. The project forms a key part of Historic England's commitment to achieve net-zero carbon emissions by 2040 and responds to the urgent requirement to replace ageing building services plant that has reached, and in some cases exceeded, its operational life. Recent equipment failures have highlighted the increasing risk to collection preservation, building resilience and operational continuity. A RIBA Stage 2 feasibility study has recently been completed. The study explored a range of options to reduce operational carbon, improve energy performance and secure the long-term sustainability of the archive while maintaining stringent environmental conditions required for collection care. Based on the information provided, Historic England's preferred option currently involves: • Replacement of existing end-of-life environmental control systems with significantly more energy-efficient solutions. • Rationalisation of archive environmental zones to improve operational efficiency. • Fabric improvements to enhance thermal performance and airtightness. • Fire safety upgrades and associated building works. • Creation of additional archive storage capacity through the repurposing of existing plant room space, reducing reliance on external storage facilities and supporting future collection growth. Scope of Services The appointed design team will be required to lead the project through: RIBA Stage 3 – Spatial Coordination Including but not limited to: • Review and validation of the completed RIBA Stage 2 outputs. • Development of the preferred design solution. • Coordination of architectural, structural and building services design, ensuring full integration of archive operational, conservation and storage requirements, and compliance with relevant standards and guidance, including BS EN 16893:2018 Evaluation and mitigation of collection care risks associated with proposed mechanical solutions. • Interpretation and integration of thermographic surveys, air-tightness testing and other specialist investigations. • Use and develop the client-provided Revit BIM model as the principal tool for multidisciplinary spatial coordination, ensuring that all proposed building-services systems, plant, access requirements and interfaces are accurately modelled and coordinated with the architectural and structural design. • Review, validate and develop the existing building physics model to a level appropriate for RIBA Stage 3, reflecting the spatially coordinated design and demonstrating performance against the agreed environmental requirements, energy and carbon targets, plant loads and future climate scenarios. • Planning application preparation and submission. • Cost planning and value management exercises. • Development of a robust whole-life cost and carbon assessment. • Stakeholder engagement and workshop facilitation. • Support Historic England’s fundraising activities for the project by providing reasonable information, evidence, and documentation to assist fundraising and grant applications where requested.