East West Rail - Further Critical Works

NETWORK RAIL INFRASTRUCTURE LIMITED

Awarded

Key facts

Closing date
Not stated by the buyer
Buyer's estimated value
Not stated The buyer's own estimate, not income to you.
Procedure
Direct award
Notice type
Transparency notice (UK5)

Decision brief

Taken from the buyer's published notice (shown as written, shortened where long). Tenderpatch has not added to or interpreted it. Always read the official documents before bidding.

How bids will be scored
Not stated in the notice.
Conditions of participation (what you must show)
None published in the notice. They may be in the tender documents.
Contract length and extensions
Period not stated.
How to submit
Not stated in the notice.
Tender documents
No document links in the notice. Use the official notice link.
New to public tenders? Plain-English guide to this page
Framework
An agreement that sets terms for work the buyer may order later, often from several suppliers. The value shown usually covers the whole agreement, not one job.
Open for bids / closing date
You must submit by the closing date and time, normally through the buyer's own online portal. Late bids are normally refused.
Clarification questions
A deadline for asking the buyer questions about the tender. It is earlier than the closing date.
Conditions of participation
What the buyer asks suppliers to show before they can be considered, such as experience, insurance or accreditations.
Bids are scored on
How the buyer will compare bids, usually a split between price and quality. A 60/40 split in favour of quality means the cheapest bid will not necessarily win.
Lots
A tender can be split into parts. You can often bid for only the lots that suit you.
Area (ITL)
The buyer names an official statistical area for where the work is, not a street address. Check the tender documents for the actual sites.
UK4 and other notice codes
Official codes for the type of notice. A "tender notice" means bids are being invited.

General explanations written by Tenderpatch, not part of this notice.

Description

The requirement consists of a combination of design services and construction works which are needed to increase the rail network’s operational capacity for progressive delivery of benefits from early 2030s and to support the rail networks’ early operational response to a new theme park which is set to open in 2031. The indicative high-level scope relating to this transparency notice refers only to the Marston Vale Line between Bletchley and Stewartby, and on the OXD line between Oxford Parkway and Bletchley, and Milton Keynes Central Station design services and works (subject to funding and any other required internal and external approvals): - Undertaking the design for critical rail systems upgrade and required station packages on the Martson Vale and OXD lines to support a higher capacity railway as far as Stewartby. - Re-signalling works, track upgrades including double tracking between Bletchley and Fenny Stratford and a new layout at Stewartby, passing loops, electrification, level crossing closures, bridge and underpass works, station works at Winslow, Bletchley and Stewartby, earthworks and drainage resilience. - Discharge of new planning consents under the EWRco Development Consent Order (DCO) and integration with TWAO conditions and commitments in support of the delivery of the Marston Vale Line Core Works (MVLCW). - Delivery of enabling works such as site clearance, compound set up, Flood Storage Areas (CFSA), Environmental Compensation Sites (ECS) and utility diversions - Integration of timetabling modelling between MVLCW and this scope. This includes both service outcomes and temporary arrangements including possession planning. It is currently anticipated, based on the current information, that the estimated final costs of these works and services will amount to a maximum of £650m (excluding VAT). This scope of this Transparency Notice does not include several of the final station arrangements on the Martson Vale signalling area, or the option for a train maintenance depot on the OXD lines. The requirements for this will be procured separately. Information on the wider East West Rail project can be found at East West Rail | Project overview. The in scope design services and works will require significant coordination and integration with the ongoing works currently being delivered by the East West Rail Alliance (EWRA) on the Marston Vale Line, referred to as the Marston Vale Line Core Works (MVLCW). This includes design integration, as well as the management and delivery of the works on the same site, at the same time and, on the same rail systems, therefore Network Rail consider this an extension of existing work. An overview of the existing MVLCW scope includes: - Multiple level crossing closures and bridge work (including BF01) on the Marston Vale Line - Signalling and control system alterations associated with level crossing works and associated track works - Other coordinated bridge works - Timetable development works - Options for safety enhancements at stations including tactile edges, extension of existing station lighting, announcement, wayfinding and customer information systems if required - Resilience infrastructure works including track, drainage and earthworks